top of page

kitchen cABINETS

GRG was responsible for: â€‹

  • Fabricate cabinets. 

  • Install cabinets and counter top.

  • Install cabinets at.

  • Plumbing system.

  • Electrical system.

  • Finish work.

  • Replace tile floor.

bottom of page